IDENTIFYING CAUSES OF DELAY IN OIL AND GAS CONSTRUCTION PROJECTS USING FUZZY DELPHI METHOD

Authors

  • Aliyeh Kazemi Department of Industrial Management, Faculty of Management, University of Tehran, Iran Author
  • Ali Katebi Department of Civil Engineering, Engineering Faculty, Kharazmi University, Iran Author
  • MOHAMMAD-HOSSEIN KAZEMI Author

DOI:

https://doi.org/10.35945/

Keywords:

PROJECT MANAGEMENT, CONSTRUCTION PROJECTS, OIL AND GAS INDUSTRY, FUZZY DELPHI METHOD

Abstract

One of the challenges project managers are dealt with is management of delay in construction projects. Organizations particularly pay special attention to the efficient manage-ment of projects and make a lot of efforts to achieve this goal by reducing delay in projects. Analyzing the factors causing

delay is essential with the aim of omitting them and timely implementation of these projects. On account of the impor-tance of oil and gas projects, in this research the factors caus-ing delay in oil and gas construction projects are taken in to the consideration. These factors are identified by using fuzzy Delphi method.

Downloads

Download data is not yet available.

Downloads

Published

25.07.2023

Issue

Section

Publishing permissions

How to Cite

IDENTIFYING CAUSES OF DELAY IN OIL AND GAS CONSTRUCTION PROJECTS USING FUZZY DELPHI METHOD. (2023). Globalization and Business, 3(5), 207-214. https://doi.org/10.35945/

Share